{ "currentVersion": 10.91, "cimVersion": "2.9.0", "serviceDescription": "NCDOT 2018-2020 Highway Maintenance Improvement Program (HMIP), 4th Quarter 2016 \u2013 NC Department of Transportation @@ (Saturday, November 16, 2019)", "mapName": "Layers", "description": "The data is a visual representation of the roads in the 2018-2020 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. \nG.S. 136-44.3A requires the NC DOT to submit a three year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year\u2019s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2018-2020 HMIP was approved by the Board of Transportation at their March 9, 2017 meeting. \n* The estimated cost data shown is not reflective of the actual engineer's estimate.", "copyrightText": "NCDOT GIS unit", "supportsDynamicLayers": true, "layers": [ { "id": 0, "name": "NCDOT HMIP 2018", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 1, "name": "NCDOT HMIP 2019", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 2, "name": "NCDOT HMIP 2020", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true } ], "tables": [], "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 }, "singleFusedMapCache": false, "initialExtent": { "xmin": -1346773.1728661666, "ymin": -1883975.7142420765, "xmax": 4782068.830578611, "ymax": 2426786.694113696, "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "fullExtent": { "xmin": 406980.0801629275, "ymin": 54531.589622333646, "xmax": 3051287.5001989305, "ymax": 1039949.6594646722, "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "datesInUnknownTimezone": false, "minScale": 0, "maxScale": 0, "units": "esriFeet", "supportedImageFormatTypes": "PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP", "documentInfo": { "Title": "NCDOT HMIP 2018-2020", "Author": "", "Comments": "The data is a visual representation of the roads in the 2018-2020 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. \nG.S. 136-44.3A requires the NC DOT to submit a three year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year\u2019s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2018-2020 HMIP was approved by the Board of Transportation at their March 9, 2017 meeting. \n* The estimated cost data shown is not reflective of the actual engineer's estimate.", "Subject": "NCDOT 2018-2020 Highway Maintenance Improvement Program (HMIP), 4th Quarter 2016 \u2013 NC Department of Transportation", "Category": "", "AntialiasingMode": "None", "TextAntialiasingMode": "Force", "Version": "2.9.0", "Keywords": "NC,NCDOT,Transportation,HMIP,Maintenance" }, "capabilities": "Map,Query,Data", "supportedQueryFormats": "JSON, geoJSON, PBF", "exportTilesAllowed": false, "referenceScale": 0.0, "supportsDatumTransformation": true, "archivingInfo": {"supportsHistoricMoment": false}, "supportsClipping": true, "supportsSpatialFilter": true, "supportsTimeRelation": true, "supportsQueryDataElements": true, "maxRecordCount": 1000, "maxImageHeight": 4096, "maxImageWidth": 4096, "supportedExtensions": "" }