{ "currentVersion": 10.91, "cimVersion": "2.9.0", "serviceDescription": "This data contains roads in the 2020-2024 HMIP as approved by the Board of Transportation (geoservice date: 3/14/2019) @@ (Saturday, November 16, 2019)", "mapName": "Layers", "description": "The data is a visual representation of the roads in the 2020-2024 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation.\nG.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year\u2019s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2020-2024 HMIP was approved by the Board of Transportation at their March 7, 2019 meeting.\n* The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset\nThere are no measurement, precision, spatial, or data schema standards assigned to this data set.\nLineage of dataset\nField Divisions create their HMIP in the NCDOT\u2019s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official.\nFields\nPlan Year \u2013 The fiscal year in which the plan is to be executed\nCounty \u2013 The county in which the route exists\nRoute Name \u2013 The route to be treated\nBegin Description \u2013 The physical description of the begin limit of where the treatment is to be applied\nEnd Description - The physical description of the end limit of where the treatment is to be applied\nLength \u2013 The length in miles of the treatment\nBudget Group \u2013 The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation\nTreatment \u2013 The treatment to be applied\nEstimated Cost \u2013 The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 3/14/2019)", "copyrightText": "NCDOT PMU", "supportsDynamicLayers": true, "layers": [ { "id": 0, "name": "NCDOT HMIP 2020", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 1, "name": "NCDOT HMIP 2021", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 2, "name": "NCDOT HMIP 2022", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 3, "name": "NCDOT HMIP 2023", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true }, { "id": 4, "name": "NCDOT HMIP 2024", "parentLayerId": -1, "defaultVisibility": true, "subLayerIds": null, "minScale": 0, "maxScale": 0, "type": "Feature Layer", "geometryType": "esriGeometryPolyline", "supportsDynamicLegends": true } ], "tables": [], "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 }, "singleFusedMapCache": false, "initialExtent": { "xmin": -20952.990889700828, "ymin": -1212400.6140116258, "xmax": 3728021.476048935, "ymax": 1424465.8923987653, "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "fullExtent": { "xmin": 408738.9126032144, "ymin": 46863.37562805414, "xmax": 3051823.0030648857, "ymax": 1042834.6195739806, "spatialReference": { "wkid": 102719, "latestWkid": 2264, "xyTolerance": 0.003280833333333333, "zTolerance": 0.001, "mTolerance": 0.001, "falseX": -121841900, "falseY": -93659000, "xyUnits": 3.6365718124241434E7, "falseZ": -100000, "zUnits": 10000, "falseM": -100000, "mUnits": 10000 } }, "datesInUnknownTimezone": false, "minScale": 0, "maxScale": 0, "units": "esriFeet", "supportedImageFormatTypes": "PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP", "documentInfo": { "Title": "NCDOT HMIP 2019-2023", "Author": "", "Comments": "The data is a visual representation of the roads in the 2020-2024 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation.\nG.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year\u2019s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2020-2024 HMIP was approved by the Board of Transportation at their March 7, 2019 meeting.\n* The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset\nThere are no measurement, precision, spatial, or data schema standards assigned to this data set.\nLineage of dataset\nField Divisions create their HMIP in the NCDOT\u2019s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official.\nFields\nPlan Year \u2013 The fiscal year in which the plan is to be executed\nCounty \u2013 The county in which the route exists\nRoute Name \u2013 The route to be treated\nBegin Description \u2013 The physical description of the begin limit of where the treatment is to be applied\nEnd Description - The physical description of the end limit of where the treatment is to be applied\nLength \u2013 The length in miles of the treatment\nBudget Group \u2013 The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation\nTreatment \u2013 The treatment to be applied\nEstimated Cost \u2013 The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 3/14/2019)", "Subject": "This data contains roads in the 2020-2024 HMIP as approved by the Board of Transportation (geoservice date: 3/14/2019)", "Category": "", "AntialiasingMode": "None", "TextAntialiasingMode": "Force", "Version": "2.9.0", "Keywords": "NC,NCDOT,Transportation,HMIP,Maintenance" }, "capabilities": "Map,Query,Data", "supportedQueryFormats": "JSON, geoJSON, PBF", "exportTilesAllowed": false, "referenceScale": 0.0, "supportsDatumTransformation": true, "archivingInfo": {"supportsHistoricMoment": false}, "supportsClipping": true, "supportsSpatialFilter": true, "supportsTimeRelation": true, "supportsQueryDataElements": true, "maxRecordCount": 1000, "maxImageHeight": 4096, "maxImageWidth": 4096, "supportedExtensions": "" }