View In:
ArcGIS JavaScript
ArcGIS Online Map Viewer
ArcGIS Earth
ArcMap
ArcGIS Pro
View Footprint In:
ArcGIS Online Map Viewer
Service Description: The data is a visual representation of the roads in the 2021-2025 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2021-2025 HMIP was approved by the Board of Transportation at their March 2020 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset There are no measurement, precision, spatial, or data schema standards assigned to this data set. Lineage of dataset Field Divisions create their HMIP in the NCDOT’s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official. Fields Plan Year – The fiscal year in which the plan is to be executed County – The county in which the route exists Route Name – The route to be treated Begin Description – The physical description of the begin limit of where the treatment is to be applied End Description - The physical description of the end limit of where the treatment is to be applied Length – The length in miles of the treatment Budget Group – The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation Treatment – The treatment to be applied Estimated Cost – The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 4/7/2020)
Map Name: Layers
Legend
All Layers and Tables
Dynamic Legend
Dynamic All Layers
Layers:
Description: The data is a visual representation of the roads in the 2020-2024 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2020-2024 HMIP was approved by the Board of Transportation at their March 7, 2019 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset There are no measurement, precision, spatial, or data schema standards assigned to this data set. Lineage of dataset Field Divisions create their HMIP in the NCDOT’s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official. Fields Plan Year – The fiscal year in which the plan is to be executed County – The county in which the route exists Route Name – The route to be treated Begin Description – The physical description of the begin limit of where the treatment is to be applied End Description - The physical description of the end limit of where the treatment is to be applied Length – The length in miles of the treatment Budget Group – The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation Treatment – The treatment to be applied Estimated Cost – The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 3/19/2019)
Copyright Text: NCDOT PMU
Spatial Reference:
102719
(2264)
Single Fused Map Cache: false
Initial Extent:
XMin: 144871.29915201012
YMin: -573530.0616738859
XMax: 3315924.3325840896
YMax: 1656851.5020437597
Spatial Reference: 102719
(2264)
Full Extent:
XMin: 408738.9211333841
YMin: 46863.39990623295
XMax: 3051823.010938883
YMax: 1042834.6359781474
Spatial Reference: 102719
(2264)
Units: esriFeet
Supported Image Format Types: PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP
Document Info:
Title: NCDOT HMIP 2019-2023
Author:
Comments: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>The data is a visual representation of the roads in the 2020-2024 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2020-2024 HMIP was approved by the Board of Transportation at their March 7, 2019 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset There are no measurement, precision, spatial, or data schema standards assigned to this data set. Lineage of dataset Field Divisions create their HMIP in the NCDOT’s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official. Fields Plan Year – The fiscal year in which the plan is to be executed County – The county in which the route exists Route Name – The route to be treated Begin Description – The physical description of the begin limit of where the treatment is to be applied End Description - The physical description of the end limit of where the treatment is to be applied Length – The length in miles of the treatment Budget Group – The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation Treatment – The treatment to be applied Estimated Cost – The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 3/19/2019)</SPAN></P></DIV></DIV></DIV>
Subject: This data contains roads in the 2020-2024 HMIP as approved by the Board of Transportation (geoservice date: 3/19/2019)
Category:
Keywords: NC,NCDOT,Transportation,HMIP,Maintenance
AntialiasingMode: None
TextAntialiasingMode: Force
Supports Dynamic Layers: true
MaxRecordCount: 1000
MaxImageHeight: 4096
MaxImageWidth: 4096
Supported Query Formats: JSON, geoJSON, PBF
Supports Query Data Elements: true
Min Scale: 0
Max Scale: 0
Supports Datum Transformation: true
Child Resources:
Info
Dynamic Layer
Supported Operations:
Export Map
Identify
QueryLegends
QueryDomains
Find
Return Updates