ArcGIS REST Services Directory Login | Get Token
JSON

ItemInfo

Item Information

snippet: This data contains roads in the 2022-2026 HMIP as approved by the Board of Transportation (geoservice date: 7/27/2021)
summary: This data contains roads in the 2022-2026 HMIP as approved by the Board of Transportation (geoservice date: 7/27/2021)
extent: [[-84.4154873518879,33.7634110558317],[-75.4183644981137,36.6150846377688]]
accessInformation: NCDOT PMU
thumbnail: thumbnail/thumbnail.png
maxScale: 1.7976931348623157E308
typeKeywords: ["Data","Service","Map Service","ArcGIS Server"]
description: The data is a visual representation of the roads in the 2022-2026 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a five year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2022-2026 HMIP was approved by the Board of Transportation at their March 2021 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate. Quality of dataset There are no measurement, precision, spatial, or data schema standards assigned to this data set. Lineage of dataset Field Divisions create their HMIP in the NCDOT’s Pavement Management System. This data is then exported for Board of Transportation approval. Once approved, the HMIP plan becomes official. Fields Plan Year – The fiscal year in which the plan is to be executed County – The county in which the route exists Route Name – The route to be treated Begin Description – The physical description of the begin limit of where the treatment is to be applied End Description - The physical description of the end limit of where the treatment is to be applied Length – The length in miles of the treatment Budget Group – The budget group of the type of treatment. Must be Resurfacing, Preservation, or Rehabilitation Treatment – The treatment to be applied Estimated Cost – The estimated cost of the treatment. The estimated cost data shown is not reflective of the actual engineer's estimate. (geoservice date: 7/27/2021)
licenseInfo: The North Carolina Department of Transportation shall not be held liable for any errors in this metadata. This includes errors of omission, commission, errors concerning the content of the data, and relative and positional accuracy of the data. This data cannot be construed to be a legal document. Primary sources from which this data was compiled must be consulted for verification of information contained in this data.
catalogPath:
title: NCDOT_HMIP_2022_2026
type: Map Service
url:
tags: ["NC","NCDOT","Transportation","HMIP","Maintenance"]
culture: en-US
name: NCDOT_HMIP_2022_2026
guid: DB03C774-4234-4EE4-B9EA-45E64BF47D8C
minScale: 0
spatialReference: NAD_1983_StatePlane_North_Carolina_FIPS_3200_Feet