View In:
ArcGIS JavaScript
ArcGIS Online Map Viewer
ArcGIS Earth
ArcMap
ArcGIS Pro
View Footprint In:
ArcGIS Online Map Viewer
Service Description: NCDOT 2018-2020 Highway Maintenance Improvement Program (HMIP), 4th Quarter 2016 – NC Department of Transportation @@ (Saturday, November 16, 2019)
Map Name: Layers
Legend
All Layers and Tables
Dynamic Legend
Dynamic All Layers
Layers:
Description: The data is a visual representation of the roads in the 2018-2020 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a three year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2018-2020 HMIP was approved by the Board of Transportation at their March 9, 2017 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate.
Copyright Text: NCDOT GIS unit
Spatial Reference:
102719
(2264)
Single Fused Map Cache: false
Initial Extent:
XMin: -1346773.1728661666
YMin: -1883975.7142420765
XMax: 4782068.830578611
YMax: 2426786.694113696
Spatial Reference: 102719
(2264)
Full Extent:
XMin: 406980.0801629275
YMin: 54531.589622333646
XMax: 3051287.5001989305
YMax: 1039949.6594646722
Spatial Reference: 102719
(2264)
Units: esriFeet
Supported Image Format Types: PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP
Document Info:
Title: NCDOT HMIP 2018-2020
Author:
Comments: The data is a visual representation of the roads in the 2018-2020 Highway Maintenance Improvement Program (HMIP) as approved by the Board of Transportation. G.S. 136-44.3A requires the NC DOT to submit a three year maintenance plan covering the preservation, resurfacing, and rehabilitation plans of the divisions. Each division will have a schedule for each county for each year of the plan that includes the location, selected treatment, and estimated cost. The plan is to be based on the previous fiscal year’s Contract Resurfacing and Pavement Preservation allocations. G.S. 143B-350(f) requires the plan be posted to the Department's website by April 1st of each year. The 2018-2020 HMIP was approved by the Board of Transportation at their March 9, 2017 meeting. * The estimated cost data shown is not reflective of the actual engineer's estimate.
Subject: NCDOT 2018-2020 Highway Maintenance Improvement Program (HMIP), 4th Quarter 2016 – NC Department of Transportation
Category:
Keywords: NC,NCDOT,Transportation,HMIP,Maintenance
AntialiasingMode: None
TextAntialiasingMode: Force
Supports Dynamic Layers: true
MaxRecordCount: 1000
MaxImageHeight: 4096
MaxImageWidth: 4096
Supported Query Formats: JSON, geoJSON, PBF
Supports Query Data Elements: true
Min Scale: 0
Max Scale: 0
Supports Datum Transformation: true
Child Resources:
Info
Dynamic Layer
Supported Operations:
Export Map
Identify
QueryLegends
QueryDomains
Find
Return Updates